What is KCR project in Karachi?

What is KCR project in Karachi?

The KCR will consist of a loop line from Karachi City to Drigh Road via Liaquatabad. 29 kilometres will be revived with an additional 21 kilometre dual track from Karachi City to Jinnah International Airport, allowing the KCR to connect to the Pakistan Railway main line.

Does Karachi have trains?

Karachi Express (Urdu: کراچی ایکسپریس) is a passenger train operated daily by Pakistan Railways between Karachi and Lahore. The trip takes approximately 18 hours and 30 minutes to cover a published distance of 1,214 kilometres (754 mi), traveling along a stretch of the Karachi–Peshawar Railway Line.

What is ml1 project in Pakistan?

Karachi–Peshawar Railway Line (Urdu: کراچی–پشاور مرکزی ریل راستہ, romanized: karāčī-pešāvar markazī rēl rāsta) (also referred to as Main Line 1 or ML-1) is one of four main railway lines in Pakistan, operated and maintained by Pakistan Railways.

Is there any metro in Pakistan?

Lahore Metro is an automated rapid transit system in Lahore, Punjab, Pakistan and the first driverless metro in Pakistan. Three metro lines have been proposed, of which the Orange Line is operational. It is also Pakistan’s first metro line system.

Who is KCR?

Kalvakuntla Chandrashekar Rao (born 17 February 1954), often referred to by his initials KCR, is an Indian politician serving as the first and current Chief Minister of Telangana since 2014. He is the founder and leader of the Telangana Rashtra Samithi, a regional party in Telangana, India.

What is k4 project in Karachi?

K-IV water project (Urdu: کے فور پانی کے منصوبہ) , abbreviated as K-IV, is a pending water supply project from last 19 years being jointly developed by the provincial and federal governments in Karachi, Pakistan, to augment the city’s daily water supply.

What is orange train?

Orange Line is an automated rapid transit line in Lahore, Punjab, Pakistan and the first driverless metro in Pakistan. It is operated by the Punjab Mass Transit Authority and forms part of the Lahore Metro system. The line is Pakistan’s first metro train.

Which Pakistani train is best?

1. Pak Business Express. Known as the first-ever luxury train in Pakistan, Pak Business Express offers an immersive 18-hour journey that allows riders to witness wonderful views while enjoying world-class service in a restored 13-carriage sleeper.

Which is the longest flyover in Karachi?

Malir River Bridge
Design concrete
Total length 5,000 metres (16,000 ft)
Width 19 metres (62 ft)
Longest span 30 metres (98 ft)

Is Cpec complete?

The railway will roughly parallel the Karakoram Highway, and is expected to be complete in 2030. The cost of the entire project is estimated to be approximately $12 billion, and will require 5 years for completion.

Who owns Lahore Metro?

The system, which was constructed by the Traffic Engineering and Planning Agency (TEPA), a subsidiary of the Lahore Development Authority (LDA) at a cost Rs 29.65 billion.